• Home
  • About Us
  • Careers
  • Training
  • Resource Hub
TexasRE logo link to home
  • Compliance
  • Enforcement
  • Registration
  • Reliability Services
  • Standards
Search
Page Content
Lessons Learned

Lessons Learned from Events

  • EEA Load Shed
  • February 2, 2011, Winter Event
  • Generator Instrument Air Failures
  • Generator Step-Up High Side Switch Failure
  • Generator Step-Up High Side Switch Moisture Ingress
  • Generator Trip Due to Low Auxiliary Bus Voltage
  • Lessons Learned from Sept 8, 2011, Southern California Event
  • Low SF6 Trip Logic Leads to Inadvertent Trips
  • Misoperations Lead to Multiple Element Loss
  • Outage Coordination Error Leads to Load Loss
  • WGR Trip Due to Firmware Upgrade
  • Combined Cycle Trips Due to Lean Combustion

Helpful Links

Texas RE Info Sheet
Acronym Guide
Mailing Lists
Texas RE Welcome Packet
Ethics Hotline
OATI webPortal
Visit Texas RE

Follow Us

Contact Us

Email Us
  8000 Metropolis Drive, Building A, Suite 300 Austin, Texas 78744
512-583-4900

©2023 Texas Reliability Entity. All rights reserved.
Privacy Policy | Terms of Use