Skip to main content
Skip Navigation LinksHomeStandards & RulesNational Reliability StandardsActively Monitored NERC StandardsTransmission Operator – Actively Monitored Standards

Transmission Operator – Actively Monitored Standards

Below is a summary of NERC standards being actively monitored for a Transmission Operator (TOP). Currently, the Electric Reliability Council of Texas (ERCOT) is the region’s sole TOP.


This summary is being provided to you as a courtesy. Texas Reliability Entity, Inc. (Texas RE) recommends that you refer to the 2010 Compliance Monitoring and Enforcement Program Requirements (CMEP) Spreadsheet on the NERC Web site for the complete set of standards and requirements that are actively monitored. To find the spreadsheet, go to Compliance, then Resources. Select Resource Documents External Link on the left navigation bar. From the list, select 2010 Actively Monitored Reliability Standards.

To find the NERC Reliability Standards, visit Reliability Standards External Link on the NERC site.

To find the Texas RE implementation plan for its NERC CMEP program, please visit the Compliance page.

Key:

Compliance Audit

Self-Certification

Planned Spot Check

Exception Reporting

Requirement

Resource and Demand Balancing
BAL-005-0.1b
Automatic Generation Control R1., R1.2.
Top of Page

Critical Infrastructure Protection
CIP-001-1
Sabotage Reporting R1., R2., R3., R4.
CIP-002-1
Critical Cyber Asset Identification R1., R1.1., R1.2., R1.2.1., R1.2.2., R1.2.3., R1.2.4., R1.2.5., R1.2.6., R1.2.7., R2., R3., R3.1., R3.2., R3.3., R4.
See Implementation Table
CIP-003-1
Security Management Controls R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.3., R3., R3.1., R3.2., R3.3., R4., R4.1., R4.2., R4.3., R5., R5.1., R5.1.1., R5.1.2., R5.2., R5.3., R6.
See Implementation Table
CIP-004-1
Personnel & Training R1., R2., R2.1., R2.2., R2.2.1., R2.2.2., R2.2.3., R2.2.4., R2.3., R3., R3.1., R3.2., R3.3., R4., R4.1., R4.2.
See Implementation Table
CIP-005-1
Electronic Security Perimeter(s) R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R2., R2.1., R2.2., R2.3., R2.4., R2.5., R2.5.1., R2.5.2., R2.5.3., R2.5.4., R2.6., R3., R3.1., R3.2., R4., R4.1., R4.2., R4.3., R4.4., R4.5., R5., R5.1., R5.2., R5.3.
See Implementation Table
CIP-006-1
Physical Security of Critical Cyber Assets R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R1.7., R1.8., R1.9., R2., R2.1., R2.2., R2.3., R2.4., R3., R3.1., R3.2., R4., R4.1., R4.2., R4.3., R5., R6., R6.1., R6.2., R6.3.
See Implementation Table
CIP-007-1
Systems Security Management R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.3., R3., R3.1., R3.2., R4., R4.1., R4.2., R5., R5.1., R5.1.1., R5.1.2., R5.1.3., R5.2., R5.2.1., R5.2.2., R5.2.3., R5.3., R5.3.1., R5.3.2., R5.3.3., R6., R6.1., R6.2., R6.3., R6.4., R6.5., R7., R7.1., R7.2., R7.3., R8., R8.1., R8.2., R8.3., R8.4., R9.
See Implementation Table
CIP-008-1
Incident Reporting and Response Planning R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R2.
See Implementation Table
CIP-009-1
Recovery Plans for Critical Cyber Assets R1., R1.1., R1.2., R2., R3., R4., R5.
See Implementation Table
Top of Page

Communications
COM-001-1.1
Telecommunications R1., R1.1., R1.2., R1.3., R1.4., R2., R3., R4., R5.
COM-002-2
Communications and Coordination R1., R1.1., R2.
Top of Page

Emergency Preparedness and Operations
EOP-001-0
Emergency Operations Planning R2., R3., R3.1., R3.2., R3.3., R3.4., R4., R4.1., R4.2., R4.3., R4.4., R5., R6., R7., R7.1., R7.2., R7.3., R7.4.
EOP-003-1
Load Shedding Plans R1., R2., R3., R4., R5., R6., R7., R8.
EOP-004-1
Disturbance Reporting R2., R3., R3.1., R3.2., R3.3., R3.4.
EOP-005-1
System Restoration Plans R1., R2., R3., R4., R5., R6., R7., R8., R9., R10., R10.1., R11., R11.1., R11.2., R11.4., R11.5., R11.5.1., R11.5.2., R11.5.3., R11.5.4.
EOP-008-0
Plans for Loss of Control Center Functionality R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R1.7., R1.8.
Top of Page

Facilities Design, Connections, and Maintenance
FAC-014-2
Establish and Communicate System Operating Limits R2., R5.2.
Top of Page

Interchange Scheduling and Coordination
INT-004-2
Dynamic Interchange Transaction Modifications R1.
Top of Page

Interconnection Reliability Operations and Coordination
IRO-001-1.1
Reliability Coordination - Responsibilities and Authorities R8.
IRO-002-1
Reliability Coordination - Facilities R3.
IRO-004-1
Reliability Coordination - Operations Planning R3., R4., R7.
IRO-005-2
Reliability Coordination - Current-Day Operations R8., R13.
IRO-006-4
Reliability Coordination - Transmission Loading Relief R2.
Top of Page

Nuclear
NUC-001-1
Nuclear Plant Interface Coordination R2., R3., R4., R4.1., R4.2., R4.3., R6., R8., R9., R9.1., R9.1.1., R9.1.2., R9.1.3., R9.1.4., R9.2., R9.2.1., R9.2.2., R9.2.3., R9.3., R9.3.1., R9.3.2., R9.3.3., R9.3.4., R9.3.5., R9.3.6., R9.3.7., R9.4., R9.4.1., R9.4.2., R9.4.3., R9.4.4., R9.4.5.
Top of Page

Personnel Performance, Training, and Qualifications
PER-001-0
Operating Personnel Responsibility and Authority R1.
PER-002-0
Operating Personnel Training R1., R2., R2.1., R2.2., R3., R3.1., R3.2., R3.3., R3.4., R4.
PER-003-0
Operating Personnel Credentials R1., R1.1., R1.2.
Top of Page

Protection and Control
PRC-001-1
System Protection Coordination R1., R2., R2.2., R3., R3.2., R4., R5., R5.2., R6.
PRC-007-0
Assuring Consistency of Entity Underfrequency Load Shedding Programs R2.
PRC-009-0
Analysis and Documentation of Underfrequency Load Shedding Performance Following an Underfrequency Event R1., R1.1., R1.2., R1.3., R1.4., R2.
PRC-010-0
Technical Assessment of the Design and Effectiveness of Undervoltage Load Shedding Program R1., R1.1., R1.1.1., R1.1.2., R1.1.3., R2.
PRC-022-1
Under-Voltage Load Shedding Program Performance R1., R1.1., R1.2., R1.3., R1.4., R1.5., R2.
Top of Page

Transmission Operations
TOP-001-1
Reliability Responsibilities and Authorities R1., R2., R3., R5., R6., R7., R7.1., R7.2., R7.3., R8.
TOP-002-2
Normal Operations Planning R1., R2., R4., R5., R6., R10., R11., R16., R16.1., R16.2., R17., R18., R19.
TOP-003-0
Planned Outage Coordination R1., R1.1., R1.2., R1.3., R2., R3.
TOP-004-2
Transmission Operations R1., R2., R3., R4., R5., R6., R6.1., R6.2., R6.3., R6.4.
TOP-005-1.1
Operational Reliability Information R1., R3.
TOP-006-1
Monitoring System Conditions R1., R1.2., R2., R3., R4., R5., R6., R7.
TOP-007-0
Reporting System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations R1., R2., R3.
TOP-008-1
Response to Transmission Limit Violations R1., R2., R3., R4.
Top of Page

Voltage and Reactive
VAR-001-1
Voltage and Reactive Control R1., R2., R3., R3.1., R3.2., R4., R6., R6.1., R7., R8., R9., R9.1., R10., R11., R12.
Top of Page

© 2012 Texas Reliability Entity. All rights reserved.