Planning Authority – Actively Monitored Standards
Below is a summary of NERC standards being actively monitored for a Planning Authority (PA). Currently, the Electric Reliability Council of Texas (ERCOT) is the region’s sole PA.
This summary is being provided to you as a courtesy. Texas Reliability Entity, Inc. (Texas RE) recommends that you refer to the 2010 Compliance Monitoring and Enforcement Program Requirements (CMEP) Spreadsheet on the NERC Web site for the complete set of standards and requirements that are actively monitored. To find the spreadsheet, go to Compliance, then Resources. Select Resource Documents
on the left navigation bar. From the list, select 2010 Actively Monitored Reliability Standards.
To find the NERC Reliability Standards, visit Reliability Standards
on the NERC site.
To find the Texas RE implementation plan for its NERC CMEP program, please visit the Compliance page.
Key:
Compliance Audit
Self-Certification
Planned Spot Check
Exception Reporting
Requirement
Facilities Design, Connections, and Maintenance |
FAC-002-0
|
Coordination of Plans For New Generation, Transmission, and End-User |
R2. |
FAC-010-2
|
System Operating Limits Methodology for the Planning Horizon |
R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.2.1., R2.2.2., R2.2.3., R2.3., R2.3.1., R2.3.2., R2.4., R2.5., R2.6., R2.6.1., R3., R3.1., R3.2., R3.3., R3.4., R3.5., R3.6., R4., R4.1., R4.2., R4.3., R5. |
FAC-013-1
|
Establish and Communicate Transfer Capabilities |
R1., R2., R2.2. |
FAC-014-2
|
Establish and Communicate System Operating Limits |
R3., R4., R5., R5.3., R6., R6.1., R6.2. |
Top of Page
Modeling, Data, and Analysis |
MOD-016-1.1
|
Documentation of Data Reporting Requirements for Actual and Forecast Demands |
R1., R1.1., R3., R3.1. |
MOD-017-0.1
|
Aggregated Actual and Forecast Demands and Net Energy for Load |
R1., R1.1., R1.2., R1.3., R1.4. |
MOD-018-0
|
Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load |
R1., R1.1., R1.2., R1.3., R2. |
MOD-019-0.1
|
Reporting of Interruptible Demands and Direct Control Load Management |
R1. |
Top of Page
Nuclear |
NUC-001-1
|
Nuclear Plant Interface Coordination |
R2., R3., R4., R4.1., R4.2., R4.3., R6., R8., R9., R9.1., R9.1.1., R9.1.2., R9.1.3., R9.1.4., R9.2., R9.2.1., R9.2.2., R9.2.3., R9.3., R9.3.1., R9.3.2., R9.3.3., R9.3.4., R9.3.5., R9.3.6., R9.3.7., R9.4., R9.4.1., R9.4.2., R9.4.3., R9.4.4., R9.4.5. |
Top of Page
Transmission Planning |
TPL-001-0.1 Annual Periodic Data Submittals
|
System Performance Under Normal (No Contingency) Conditions (Category A) |
R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R2., R2.1., R2.1.1., R2.1.2., R2.1.3., R2.2., R3. |
TPL-002-0 Annual Periodic Data Submittals
|
System Performance Following Loss of a Single Bulk Electric System Element (Category B) |
R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.10., R1.3.11., R1.3.12., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R1.5., R2., R2.1., R2.1.1., R2.1.2., R2.1.3., R2.2., R3. |
TPL-003-0 Annual Periodic Data Submittals
|
System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) |
R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.10., R1.3.11., R1.3.12., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R1.5., R2., R2.1., R2.1.1., R2.1.2., R2.1.3., R2.2., R3. |
TPL-004-0 Annual Periodic Data Submittals
|
System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) |
R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R2. |