Skip to main content
Skip Navigation LinksHomeStandards & RulesNational Reliability StandardsActively Monitored NERC StandardsPlanning Authority – Actively Monitored Standards

Planning Authority – Actively Monitored Standards

Below is a summary of NERC standards being actively monitored for a Planning Authority (PA). Currently, the Electric Reliability Council of Texas (ERCOT) is the region’s sole PA.


This summary is being provided to you as a courtesy. Texas Reliability Entity, Inc. (Texas RE) recommends that you refer to the 2010 Compliance Monitoring and Enforcement Program Requirements (CMEP) Spreadsheet on the NERC Web site for the complete set of standards and requirements that are actively monitored. To find the spreadsheet, go to Compliance, then Resources. Select Resource Documents External Link on the left navigation bar. From the list, select 2010 Actively Monitored Reliability Standards.

To find the NERC Reliability Standards, visit Reliability Standards External Link on the NERC site.

To find the Texas RE implementation plan for its NERC CMEP program, please visit the Compliance page.

Key:

Compliance Audit

Self-Certification

Planned Spot Check

Exception Reporting

Requirement

Facilities Design, Connections, and Maintenance
FAC-002-0
Coordination of Plans For New Generation, Transmission, and End-User R2.
FAC-010-2
System Operating Limits Methodology for the Planning Horizon R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.2.1., R2.2.2., R2.2.3., R2.3., R2.3.1., R2.3.2., R2.4., R2.5., R2.6., R2.6.1., R3., R3.1., R3.2., R3.3., R3.4., R3.5., R3.6., R4., R4.1., R4.2., R4.3., R5.
FAC-013-1
Establish and Communicate Transfer Capabilities R1., R2., R2.2.
FAC-014-2
Establish and Communicate System Operating Limits R3., R4., R5., R5.3., R6., R6.1., R6.2.
Top of Page

Modeling, Data, and Analysis
MOD-016-1.1
Documentation of Data Reporting Requirements for Actual and Forecast Demands R1., R1.1., R3., R3.1.
MOD-017-0.1
Aggregated Actual and Forecast Demands and Net Energy for Load R1., R1.1., R1.2., R1.3., R1.4.
MOD-018-0
Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load R1., R1.1., R1.2., R1.3., R2.
MOD-019-0.1
Reporting of Interruptible Demands and Direct Control Load Management R1.
Top of Page

Nuclear
NUC-001-1
Nuclear Plant Interface Coordination R2., R3., R4., R4.1., R4.2., R4.3., R6., R8., R9., R9.1., R9.1.1., R9.1.2., R9.1.3., R9.1.4., R9.2., R9.2.1., R9.2.2., R9.2.3., R9.3., R9.3.1., R9.3.2., R9.3.3., R9.3.4., R9.3.5., R9.3.6., R9.3.7., R9.4., R9.4.1., R9.4.2., R9.4.3., R9.4.4., R9.4.5.
Top of Page

Transmission Planning
TPL-001-0.1
Annual Periodic Data Submittals
System Performance Under Normal (No Contingency) Conditions (Category A) R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R2., R2.1., R2.1.1., R2.1.2., R2.1.3., R2.2., R3.
TPL-002-0
Annual Periodic Data Submittals
System Performance Following Loss of a Single Bulk Electric System Element (Category B) R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.10., R1.3.11., R1.3.12., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R1.5., R2., R2.1., R2.1.1., R2.1.2., R2.1.3., R2.2., R3.
TPL-003-0
Annual Periodic Data Submittals
System Performance Following Loss of Two or More Bulk Electric System Elements (Category C) R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.10., R1.3.11., R1.3.12., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R1.5., R2., R2.1., R2.1.1., R2.1.2., R2.1.3., R2.2., R3.
TPL-004-0
Annual Periodic Data Submittals
System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) R1., R1.1., R1.2., R1.3., R1.3.1., R1.3.2., R1.3.3., R1.3.4., R1.3.5., R1.3.6., R1.3.7., R1.3.8., R1.3.9., R1.4., R2.
Top of Page

© 2011 Texas Reliability Entity. All rights reserved.