Skip Navigation LinksHomeStandards & RulesNational Reliability StandardsActively Monitored NERC StandardsLoad Serving Entity – Actively Monitored Standards

Load Serving Entity – Actively Monitored Standards

Below is a summary of NERC standards being actively monitored for a Load Serving Entity (LSE).


This summary is being provided to you as a courtesy. Texas Reliabilty Entity, Inc. (Texas RE) recommends that you refer to the 2010 Compliance Monitoring and Enforcement Program Requirements (CMEP) Spreadsheet on the NERC Web site for the complete set of standards and requirements that are actively monitored. To find the spreadsheet, go to Compliance, then Resources. Select Resource Documents External Link on the left navigation bar. From the list, select 2010 Actively Monitored Reliability Standards.

To find the NERC Reliability Standards, visit Reliability Standards External Link on the NERC site.

To find the Texas RE implementation plan for its NERC CMEP program, please visit the Compliance page.

Key:

Compliance Audit

Self-Certification

Planned Spot Check

Exception Reporting

Requirement

Resource and Demand Balancing
BAL-005-0.1b
Automatic Generation Control R1., R1.3.
Top of Page

Critical Infrastructure Protection
CIP-001-1
Sabotage Reporting R1., R2., R3., R4.
CIP-002-1
Critical Cyber Asset Identification R1., R1.1., R1.2., R1.2.1., R1.2.2., R1.2.3., R1.2.4., R1.2.5., R1.2.6., R1.2.7., R2., R3., R3.1., R3.2., R3.3., R4.
See Implementation Table
CIP-003-1
Security Management Controls R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.3., R3., R3.1., R3.2., R3.3., R4., R4.1., R4.2., R4.3., R5., R5.1., R5.1.1., R5.1.2., R5.2., R5.3., R6.
See Implementation Table
CIP-004-1
Personnel & Training R1., R2., R2.1., R2.2., R2.2.1., R2.2.2., R2.2.3., R2.2.4., R2.3., R3., R3.1., R3.2., R3.3., R4., R4.1., R4.2.
See Implementation Table
CIP-005-1
Electronic Security Perimeter(s) R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R2., R2.1., R2.2., R2.3., R2.4., R2.5., R2.5.1., R2.5.2., R2.5.3., R2.5.4., R2.6., R3., R3.1., R3.2., R4., R4.1., R4.2., R4.3., R4.4., R4.5., R5., R5.1., R5.2., R5.3.
See Implementation Table
CIP-006-1
Physical Security of Critical Cyber Assets R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R1.7., R1.8., R1.9., R2., R2.1., R2.2., R2.3., R2.4., R3., R3.1., R3.2., R4., R4.1., R4.2., R4.3., R5., R6., R6.1., R6.2., R6.3.
See Implementation Table
CIP-007-1
Systems Security Management R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.3., R3., R3.1., R3.2., R4., R4.1., R4.2., R5., R5.1., R5.1.1., R5.1.2., R5.1.3., R5.2., R5.2.1., R5.2.2., R5.2.3., R5.3., R5.3.1., R5.3.2., R5.3.3., R6., R6.1., R6.2., R6.3., R6.4., R6.5., R7., R7.1., R7.2., R7.3., R8., R8.1., R8.2., R8.3., R8.4., R9.
See Implementation Table
CIP-008-1
Incident Reporting and Response Planning R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R2.
See Implementation Table
CIP-009-1
Recovery Plans for Critical Cyber Assets R1., R1.1., R1.2., R2., R3., R4., R5.
See Implementation Table
Top of Page

Emergency Preparedness and Operations
EOP-002-2.1
Capacity and Energy Emergencies R9., R9.1.
EOP-004-1
Disturbance Reporting R2., R3., R3.1., R3.2., R3.3., R3.4.
Top of Page

Facilities Design, Connections, and Maintenance
FAC-002-0
Coordination of Plans For New Generation, Transmission, and End-User R1.4., R1.5., R2., R1., R1.1., R1.2., R1.3.
Top of Page

Interconnection Reliability Operations and Coordination
IRO-001-1.1
Reliability Coordination - Responsibilities and Authorities R8.
IRO-004-1
Reliability Coordination - Operations Planning R4.
IRO-005-2
Reliability Coordination - Current-Day Operations R13.
Top of Page

Modeling, Data, and Analysis
MOD-017-0.1
Aggregated Actual and Forecast Demands and Net Energy for Load R1., R1.1., R1.2., R1.3., R1.4.
MOD-018-0
Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for Load R1., R1.1., R1.2., R1.3., R2.
MOD-019-0.1
Reporting of Interruptible Demands and Direct Control Load Management R1.
MOD-020-0
Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators R1.
MOD-021-0
Documentation of the Accounting Methodology for the Effects of Controllable DSM in Demand and Energy Forecasts R1., R2., R3.
Top of Page

Nuclear
NUC-001-1
Nuclear Plant Interface Coordination R2., R3., R4., R4.1., R4.2., R4.3., R6., R8., R9., R9.1., R9.1.1., R9.1.2., R9.1.3., R9.1.4., R9.2., R9.2.1., R9.2.2., R9.2.3., R9.3., R9.3.1., R9.3.2., R9.3.3., R9.3.4., R9.3.5., R9.3.6., R9.3.7., R9.4., R9.4.1., R9.4.2., R9.4.3., R9.4.4., R9.4.5.
Top of Page

Protection and Control
PRC-007-0
Assuring Consistency of Entity Underfrequency Load Shedding Programs R2.
PRC-009-0
Analysis and Documentation of Underfrequency Load Shedding Performance Following an Underfrequency Event R1., R1.1., R1.2., R1.3., R1.4., R2.
PRC-010-0
Technical Assessment of the Design and Effectiveness of Undervoltage Load Shedding Program R1., R1.1., R1.1.1., R1.1.2., R1.1.3., R2.
PRC-022-1
Under-Voltage Load Shedding Program Performance R1., R1.1., R1.2., R1.3., R1.4., R1.5., R2.
Top of Page

Transmission Operations
TOP-001-1
Reliability Responsibilities and Authorities R4.
TOP-002-2
Normal Operations Planning R3., R18.