Skip to main content
Skip Navigation LinksHomeStandards & RulesNational Reliability StandardsActively Monitored NERC StandardsGeneration Operator – Actively Monitored Standards

Generation Operator – Actively Monitored Standards

Below is a summary of NERC standards being actively monitored for a Generation Operator (GOP).


This summary is being provided to you as a courtesy. Texas Reliability Entity, Inc. (Texas RE) recommends that you refer to the 2010 Compliance Monitoring and Enforcement Program Requirements (CMEP) Spreadsheet on the NERC Web site for the complete set of standards and requirements that are actively monitored. To find the spreadsheet, go to Compliance, then Resources. Select Resource Documents External Link on the left navigation bar. From the list, select 2010 Actively Monitored Reliability Standards.

To find the NERC Reliability Standards, visit Reliability Standards External Link on the NERC site.

To find the Texas RE implementation plan for its NERC CMEP program, please visit the Compliance page.

Key:

Compliance Audit

Self-Certification

Planned Spot Check

Exception Reporting

Requirement

Resource and Demand Balancing
BAL-005-0.1b
Automatic Generation Control R1., R1.1.
Top of Page

Critical Infrastructure Protection
CIP-001-1
Sabotage Reporting R1., R2., R3., R4.
CIP-002-1
Critical Cyber Asset Identification R1., R1.1., R1.2., R1.2.1., R1.2.2., R1.2.3., R1.2.4., R1.2.5., R1.2.6., R1.2.7., R2., R3., R3.1., R3.2., R3.3., R4.
See Implementation Table
CIP-003-1
Security Management Controls R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.3., R3., R3.1., R3.2., R3.3., R4., R4.1., R4.2., R4.3., R5., R5.1., R5.1.1., R5.1.2., R5.2., R5.3., R6.
See Implementation Table
CIP-004-1
Personnel & Training R1., R2., R2.1., R2.2., R2.2.1., R2.2.2., R2.2.3., R2.2.4., R2.3., R3., R3.1., R3.2., R3.3., R4., R4.1., R4.2.
See Implementation Table
CIP-005-1
Electronic Security Perimeter(s) R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R2., R2.1., R2.2., R2.3., R2.4., R2.5., R2.5.1., R2.5.2., R2.5.3., R2.5.4., R2.6., R3., R3.1., R3.2., R4., R4.1., R4.2., R4.3., R4.4., R4.5., R5., R5.1., R5.2., R5.3.
See Implementation Table
CIP-006-1
Physical Security of Critical Cyber Assets R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R1.7., R1.8., R1.9., R2., R2.1., R2.2., R2.3., R2.4., R3., R3.1., R3.2., R4., R4.1., R4.2., R4.3., R5., R6., R6.1., R6.2., R6.3.
See Implementation Table
CIP-007-1
Systems Security Management R1., R1.1., R1.2., R1.3., R2., R2.1., R2.2., R2.3., R3., R3.1., R3.2., R4., R4.1., R4.2., R5., R5.1., R5.1.1., R5.1.2., R5.1.3., R5.2., R5.2.1., R5.2.2., R5.2.3., R5.3., R5.3.1., R5.3.2., R5.3.3., R6., R6.1., R6.2., R6.3., R6.4., R6.5., R7., R7.1., R7.2., R7.3., R8., R8.1., R8.2., R8.3., R8.4., R9.
See Implementation Table
CIP-008-1
Incident Reporting and Response Planning R1., R1.1., R1.2., R1.3., R1.4., R1.5., R1.6., R2.
See Implementation Table
CIP-009-1
Recovery Plans for Critical Cyber Assets R1., R1.1., R1.2., R2., R3., R4., R5.
See Implementation Table
Top of Page

Communications
COM-002-2
Communications and Coordination R1.
Top of Page

Emergency Preparedness and Operations
EOP-004-1
Disturbance Reporting R2., R3., R3.1., R3.2., R3.3., R3.4.
EOP-009-0 Documentation of Blackstart Generating Unit Test Results R1., R2.
Top of Page

Interconnection Reliability Operations and Coordination
IRO-001-1.1
Reliability Coordination - Responsibilities and Authorities R8.
IRO-004-1
Reliability Coordination - Operations Planning R4.
IRO-005-2
Reliability Coordination - Current-Day Operations R13.
Top of Page

Nuclear
NUC-001-1
Nuclear Plant Interface Coordination R1., R2., R3., R4., R4.1., R4.2., R4.3., R5., R6., R7., R8., R9., R9.1., R9.1.1., R9.1.2., R9.1.3., R9.1.4., R9.2., R9.2.1., R9.2.2., R9.2.3., R9.3., R9.3.1., R9.3.2., R9.3.3., R9.3.4., R9.3.5., R9.3.6., R9.3.7., R9.4., R9.4.1., R9.4.2., R9.4.3., R9.4.4., R9.4.5.
Top of Page

Protection and Control
PRC-001-1
System Protection Coordination R1., R2., R2.1., R3., R3.1., R5., R5.1.
Top of Page

Transmission Operations
TOP-001-1
Reliability Responsibilities and Authorities R3., R6., R7., R7.1., R7.3.
TOP-002-2
Normal Operations Planning R3., R13., R14., R14.1., R14.2., R15., R18.
TOP-003-0
Planned Outage Coordination R1., R1.1., R2., R3.
TOP-006-1
Monitoring System Conditions R1.1.
Top of Page

Voltage and Reactive
VAR-002-1.1a
Generator Operation for Maintaining Network Voltage Schedules R1., R2., R2.1., R2.2., R3., R3.1., R3.2., R5.1.
Top of Page

© 2012 Texas Reliability Entity. All rights reserved.