Qualified Scheduling Entity Requirements
A Qualified Scheduling Entity (QSE) is an ERCOT Market Participant that is qualified by the ERCOT Independent System Operator (ISO) in accordance with Section 16 of the ERCOT Protocols (Registration and Qualification of Market Participants)
. QSEs register with the ERCOT independent system operator
.
QSEs submit schedules on behalf of resource entities or load serving entities (LSEs as defined by ERCOT) such as retail electric providers. QSEs must submit daily schedules for their bilateral transactions with total generation and demand, specified at zonal level, and bid curves for zonal balancing up and balancing down energy. The schedules for generation and demand are required to be balanced so that supply equals demand. QSEs also bid for ancillary services and settle financial payments with ERCOT.
QSEs must comply with the following:
ERCOT Protocols
ERCOT Operating Guides
QSEs must also register with the National Electric Reliability Corporation (NERC) for applicable NERC functions, and comply with the following:
NERC standards
To assist QSE understanding of the ERCOT market, Texas Reliability Entity, Inc. (Texas RE) offers a summary of ERCOT Protocols and Operating Guides related to QSE responsibilities, as well as related NERC standards. It is each QSE’s responsibility to review ERCOT Protocols, ERCOT Operating Guides, and NERC standards to determine its compliance obligations. Included are the methods that Texas RE uses to assess compliance.
Assessment Method Key:

Audit

Data Submittal

Investigation

Observation

Performance Metrics

Plan Submittal

Test Results
24-7 Staffing Requirements |
| Explains the QSE requirement to maintain 24-7 operations center |
| Assessment: |
 |
| Protocol(s): |
4.3.4 |
| Operating Guide(s): |
3.1.3.1 |
| NERC Standard(s): |
|
Top of Page
Backup Control Plan |
| Lists requirements for a backup control plan that describes how the QSE will communicate with ERCOT ISO in the event its primary control center is disabled |
| Assessment: |
Annual |
| Protocol(s): |
4.3.4 |
| Operating Guide(s): |
3.1.3.1 |
| NERC Standard(s): |
EOP-008-0 |
Top of Page
Balancing Energy Performance |
| Describes testing requirements for balancing energy performance |
| Assessment: |
 |
| Protocol(s): |
6.10.3.4 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Black Start Procedures |
| Identifies the obligation to maintain and update black start plans annually |
| Assessment: |
Annual |
| Protocol(s): |
|
| Operating Guide(s): |
4.6, Attachment 4A.4 |
| NERC Standard(s): |
EOP-007-0 |
Top of Page
Black Start Service and Performance |
| Explains black start services and testing requirements |
| Assessment: |
Annual |
| Protocol(s): |
6.5.8, 6.10.3.6 |
| Operating Guide(s): |
|
| NERC Standard(s): |
EOP-009-0 |
Top of Page
Dispatch Instructions Compliance |
| Describes the responsibility and need to comply with valid dispatch instructions |
| Assessment: |
 |
| Protocol(s): |
5.4.4 |
| Operating Guide(s): |
3.1.2 |
| NERC Standard(s): |
IRO-001-1 TOP-001-1 |
Top of Page
Energy Emergency Alert (EEA) Procedures, formerly known as Emergency Electric Curtailment Plan (EECP) |
| Identifies reasons and steps for an EEA, from initiation to recovery |
| Assessment: |
 |
| Protocol(s): |
|
| Operating Guide(s): |
4.5 |
| NERC Standard(s): |
EOP-002-0 |
Top of Page
Load Acting as Resource (LAAR) Performance |
Describes seasonal test requirements for a LAAR |
| Assessment: |
 |
| Protocol(s): |
6.10.2 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Net Dependable Capability Performance |
Identifies the criteria for testing generators for net dependable capability in the ERCOT system |
| Assessment: |
Seasonal |
| Protocol(s): |
6.10.2 |
| Operating Guide(s): |
3.1.4.2, 6.2.2 |
| NERC Standard(s): |
|
Top of Page
Non-Spin Reserve Service Performance |
Identifies requirements for generators that provide non-spin reserve service as an ancillary service |
| Assessment: |
 |
| Protocol(s): |
6.5.5, 6.10.5.5 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Outage Scheduling Procedures, 12-Month |
| Identifies process of scheduling outages for generation resources |
| Assessment: |
Seasonal |
| Protocol(s): |
8.1.3 |
| Operating Guide(s): |
|
| NERC Standard(s): |
TOP-003-0 |
Top of Page
Out-of-Merit Capacity (OOMC) Performance |
Lists responsibilities of QSE in supply of OOMC requested by ERCOT ISO |
| Assessment: |
 |
| Protocol(s): |
6.5.10(7,8), 6.10.8 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Out-of-Merit Energy (OOME) Performance |
Lists responsibilities of QSE in supply of OOME requested by ERCOT ISO |
| Assessment: |
 |
| Protocol(s): |
6.5.11(5), 6.10.7 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Real-Time Data Requirements |
| Describes the various real-time data to be provided to ERCOT ISO, including operating period data, QSE operating obligations, operational metering and communication, and other operational reliability data |
| Assessment: |
|
| Protocol(s): |
6.5.1.1 |
| Operating Guide(s): |
3.1.3.1, 8 |
| NERC Standard(s): |
TOP-005-0 |
Top of Page
Regulation Service Monitoring Criteria |
Describes monitoring criteria and methodology used to determine compliance with one- and ten-minute performance measures (also termed SCPS1 and SCPS2, respectively), for QSEs that provide regulation service . |
| Assessment: |
 |
| Protocol(s): |
6.10.5.3, 6.10.6 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Resource Plan Performance |
Describes QSE obligations for keeping the Resource Plan accurate and current |
| Assessment: |
 |
| Protocol(s): |
4.4.15, 4.10, 4.5.2, 6.8.2.1, 4.7 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Resource Plan Submittal and Update |
Explains QSE obligations for entering and changing the Resource Plan |
| Assessment: |
 |
| Protocol(s): |
4.4.15 |
| Operating Guide(s): |
3.1.3.2 |
| NERC Standard(s): |
|
Top of Page
Responsive Reserve Service Performance |
Describes testing requirements for responsive reserve service  |
| Assessment: |
 |
| Protocol(s): |
6.10.3.2 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
Responsive Reserve Service Performance – Hydro |
Identifies requirements to be met by hydro supplying responsive reserve service |
| Assessment: |
|
| Protocol(s): |
|
| Operating Guide(s): |
2.5.2.3 |
| NERC Standard(s): |
|
Top of Page
Schedule Control Error (SCE) Monitoring Criteria |
Describes SCE monitoring criteria and methodology used to determine compliance with one- and ten-minute performance measures (also termed SCPS1 and SCPS2, respectively), for QSEs with generation resources |
| Assessment: |
 |
| Protocol(s): |
6.10.5, 6.10.6 |
| Operating Guide(s): |
|
| NERC Standard(s): |
|
Top of Page
System Operator Training |
| Describes training requirements for ERCOT-registered TOs and QSEs, as well as ERCOT ISO system operators |
| Assessment: |
 |
| Protocol(s): |
|
| Operating Guide(s): |
1.8(1.8.1 - 1.8.5) |
| NERC Standard(s): |
|
Top of Page
Under Frequency Relay Maintenance |
| Describes testing and maintenance requirements |
| Assessment: |
Annual Maintenance Data, Logs |
| Protocol(s): |
|
| Operating Guide(s): |
7.2.4,7.2.5.1 |
| NERC Standard(s): |
PRC-008-0 |
Top of Page
Voltage Support Performance |
| Identifies generator obligations in providing voltage support |
| Assessment: |
 |
| Protocol(s): |
6.1.7, 6.5.7 |
| Operating Guide(s): |
2.10 |
| NERC Standard(s): |
|
Top of Page